Dashboard and Weekly Report
Needed file: Intervention Log CSV or XLSX. Output results: KPI cards for intervention volume and impact, trend charts, rig/category/app breakdowns, cost saving tables, Weekly mode tables, executive narrative, and Weekly Report PPTX export.
Flat Time Benchmarking
Needed files: two or more Flat Time, Operations Detail, or ideal-well CSV/XLSX files. Output results: well-to-well benchmark charts, selected well versus offsets, section heat map, synthetic ideal target, recoverable-hour opportunities, BOP review, drilling ROP, written report, and ideal-well export.
T&D
Needed file: hookload / drilling parameters CSV. Output results: broomstick-style drilling loads chart, slack-off/pickup/rotating trend, RPM and flow-rate tracks, depth-interval analysis, and interpretation notes for drag or overpull concerns.
Surge & Swab
Needed files: Operations Detail CSV/XLSX and Formation Model CSV/XLSX. Also needed: reviewed hydraulic inputs such as mud properties, string geometry, margins, and movement speed. Output results: data-readiness status, active pressure window, surge/swab screening, safe-speed guidance, and blocked-input warnings when required values are missing.
Formation
Needed file: formation tops CSV. Output results: clean Formation, TVD, and MD table plus downloadable Formation CSV. Unmatched names are shown for manual review before export.
Table
Needed file: detailed Operations Detail CSV/XLSX. Output results: review tables for spud/release timing, well sections, casing/liner details, BHA assemblies, and drilling fluid changes.
Model Well
Needed files: multiple Operations Detail CSV/XLSX files. Optional: choose a model name and custom activity merges. Output results: averaged model Operations Detail CSV using the same column structure as the reference input, with phase totals, model activity durations, and generated chronological timing.
Time Log
Needed file: Operations Detail CSV/XLSX. Output results: time-log preview and export-ready CSV with start/end time, duration, section, phase, major op, action, LT, and remarks.
ADH Master
Needed files: one or more Operations Detail CSV/XLSX files. Optional support files: BP KPI CSV/XLSX, connection Metrics CSV/XLSX, and DCIP CSV/XLSX. Output results: ADH Master XLSX with operational timing, footage, casing, section, BP, metrics, DCIP, event flags, and variance fields where evidence is available.
Well KPIs
Needed files: multiple Operations Detail CSV/XLSX files. Optional: BP Data XLSX. Output results: well ranking, section performance, trip performance, repeated activity comparison, ROP/TTC metrics, and BP benchmark table.
DCIP Time Analysis
Needed file: DCIP time analysis CSV. Output results: actual versus upper-limit target days, saved/lost hours, ahead/behind status, and schedule position up to the selected activity.
DCIP Breakdown Plan vs Actual
Needed files: Operations Detail actual CSV/XLSX plus DCIP Breakdown planned CSV. Output results: DR/FT plan-vs-actual table by phase, calculated plan hours, Gross ROP, Actual ROP, flat time, drill time, save/loss hours, and XLSX export.